Turnkey Engineering and Construction Management Services for Installation of Artificial Turf Field

State
NC
Description
The successful firm shall be responsible for providing Turnkey Engineering and Construction Management Services to replace the existing natural grass football-stadium field at Page High School, located at 201 Alma Pinnix Dr., Greensboro, NC 27405 (“Work”). Proposals shall include all aspects of design, site prep, construction and installation required for this project to be a success and to be considered a “turnkey” event. The Scope of Work shall include investigation and analysis of the existing field conditions, develop preliminary and final design of proposed artificial turf field, to include, but not be limited to, drainage and stormwater management and construction drawings in compliance with all standards, Codes and Regulations.